The View From The Shard
Project | MEP Fit Out |
---|---|
Location | The Shard, London SE1 |
Cost | £300K |
Duration | 16 Weeks |
The public entrance to The View From The Shard was fitted-out to welcome visitors and groups into The Shard Experience. Exhibition, ticketing, shopping, combined with the lobby to the lifts taking visitors to the viewing levels. Power, data, specialist lighting, air conditioning and sprinkler protection were installed.