Skip to content

Shangri-La Hotel

ProjectMechanical and Public Health Fit Out
LocationThe Shard, London SE1
Cost£500K
Duration18 Weeks

During the fit-out of the 18th-floor hotel in The Shard, we were drafted in to undertake the testing and handover of the piped services. Drainage, water, heating and cooling services were tested for handover which included the district surveyor inspections.